Case Study
Modern Bathroom Plumbing
Complete plumbing installation for a newly renovated bathroom with updated fixtures.

Project Info
Service
Installation
Project Type
Residential
Location
Halstead
Duration
4 Days
Status
Completed
Project Overview
Fresh Plumbing Behind a Brand New Bathroom.
A full bathroom renovation needed plumbing that matched the new layout. Gullwick set out the supply and waste runs, installed the new fixtures, and left the space ready for the finishing trades.

A New Layout Needed a New Plumbing Plan.
The original pipework did not suit the new fixture positions, so the entire first fix was reworked before any tiling began.
The Challenge
- Fixtures moved to new positions
- Old waste runs set at the wrong falls
- Limited access behind the stud wall
- Tight schedule around other trades
“Everything was set out exactly where we needed it. The tiler walked in the next morning and could start straight away.”
First Fix and Second Fix, Handled Properly.
We reran the supply and waste pipework to suit the new layout, then returned after tiling to fit and commission every fixture.
The Solution
- Reran hot and cold supply lines
- Set correct falls on all waste runs
- Installed basin, WC and shower set
- Commissioned and leak tested the room
The Result
The bathroom was handed over on schedule with clean pipework, correct drainage falls, and no callbacks after completion.
Project Completed
Fixtures Installed
Leak Tested
Callbacks
Project Gallery
From Problem to Finished Result.
A closer look at the plumbing upgrade from the initial condition to the completed installation.






FAQ
Questions, answered
Everything you need to know before booking your plumbing service.